• Name:
    Gabrielsberget
  • Number of turbines:
    40
  • Installed power:
    92 MW
  • Estimated annual production:
    240 GWh
  • Status:
    Transfered

Gabrielsberget

In 2008, Svevind received permission to build and operate 40 wind turbines on Gabrielsberget in Nordmaling municipality. At the beginning of 2011, the first 20 wind turbines were erected and put into operation, and the remaining 20 plants were erected in 2012. The entire park has been in full operation since the summer of 2012.

Sold: The project has been sold to a third party in 2022.